             Table 2: Summary of TLS performance indicators
                            W200     U50      U90       EPU56    SWLS     SW60      IASWA    IASWB     IASWC       Facility Status
                 Type        hybrid   hybrid    hybrid    pure      SC        SC       SC       SC        SC
                λ (mm)        200       50       90        56       N/A       60       61       61        61
             Photon energy   800-15k  60-1.5k   5-500    80-1.4k  2k-38k    5k-20k   5k-20k    5k-23k   5k-20k
                  (eV)
               B max (Tesla)  1.8      0.64     1.245   0.67(0.45)   6       3.2       3.1      3.1      3.1
              Installation  12/1994   03/1997  04/1999  09/1999   04/2002  01/2004  12/2005   06/2009  02/2010
 ACTIVITY REPORT  2016
                Location      sec. 5   sec. 3   sec. 6    sec. 2   sec. 1   sec. 4  arc sec. 6  arc sec. 2  arc sec. 4


                                                                                 monthly beam stability index of
             Table 3:  Summary of TLS performance indicators
                                                                                 TLS; it was satisfactory all year. The
                    Scheduled               MTBF                     Beam        scheduled user time, beam avail-
             Year   user time   Availability          Operating     stability    ability, beam stability index 0.1%,
                                                        mode
                      (hour)                (hour)                ΔI/I 0 < 0.1%  and MTBF of each quarter in 2016
             2003     5017       97.2%       313.6      decay        86%         are shown together in Fig. 3; the
             2004     4235       97.5%       132.3      decay        85%         accelerator performance obviously
             2005     4576       96.8%       81.7    decay/top-up    76%         greatly improved since mid 2015
             2006     5552       96.7%       40.8       top-up      81.3%        and continued well in 2016.
             2007     5219       98.1%       85.6       top-up      98.1%
             2008     5726       97.9%       112.3      top-up      98.5%        Replacement and improve-
             2009     5402       97.9%       77.2       top-up      89.2%        ment of main components
             2010     5286       97.4%       81.3       top-up      82.1%
             2011     5818       95.9%       55.4       top-up      89.4%        Linac:
             2012           5197  98.1%      44.8       top-up      91.4%        • Linac klystron filament was re-
             2013     5178       99.5%       140        top-up      95.5%         placed with a new power-supply
             2014     5645       99.4%       182.1      top-up      94.1%         component.
             2015     5327       98.7%       84.6       top-up      87.7%
             2016     5526       98.2%       100.5      top-up      97.5%        Power supplies of magnets:
                                                                                 • The circuit performance for noise
                                                                                  rejection of the TLS kicker was
                                                                                  improved.
                                                                                 • A full-sine-wave power supply
                                                                                  for the septum magnet was
                                                                                  implemented.

                                                                                 Instruments and controls:
                                                                                 • A second power-amplifier loop
                                                                                  on the vertical transverse-feed-
                                                                                  back  system was upgrated to
                                                                                  enhance the feedback power.
                                                                                 • EPICS (experimental physics and
                                                                                  industrial control system) control
                                                                                  interfaces for the injection wave-
                                                                                  form display were updated.

                                                                                 Lattice:
           Fig. 2: Summary of beam stability index of 0.1%, availability and MTBF of TLS from 2006   • The chromaticity of storage ring
                to 2016.
                                                                                  was minimized.

           h and 97.5%, respectively. Once an original component of old type aged   Environmental monitor:
           to show poor performance, it was upgraded to a new module as soon as   • Ethernet cameras inside the
           practicable.  For example, the power supplies of the quadrupole magnets   shielding tunnel for remote
           were all replaced with new ones, the same modules as used for TPS. The   monitoring and recording were
           beam performance then gradually improved. Illustrated in Table 4 is the   installed.