NSRRC Activity Report 2023

Facility Development and Status 093 Fig. 5 : MTBF and beam trip statistics of the TPS from 2017 onward. Fig. 6 : Rations of beam trips of the TPS accelerators in 2023. (24 trip events in total) Fig. 7 : Proportions of downtime in the TPS accelerators in 2023. (50.79 hours in total)

RkJQdWJsaXNoZXIy NjQ3NjM2